PEM Buildings
EMAIL   |   SITEMAP  
 
 
  SELF CARRYING ARCH-SYSTEM
 
11 FOREVER TIGHT
 

The renovation of flat roofs with the LEGATO system guarantees the absolute tightness of the building for many decades.

The assembly of the Arch-System is made without interruption of the customers business and at shortest assembling time. It is usually not necessary to remove the existing roofing. Due to the low weight of the new roof system the static effect on the building is reduced to a minimum.

We offer the whole package including drainage, plumbing works and accessories from a hand.

Optional use of the single-skin Arch-System for weather protection or double-skin System with insulation for the creation of additional space.


Legato, Flachdachsanierung







>>detail

 
 
 
PEM buildings - Your supplier for pre engineered metal buildings, warehouses and industrial plants
before
 
PEM buildings - Your supplier for pre engineered metal buildings, warehouses and industrial plants
after
 
PEM buildings - Your supplier for pre engineered metal buildings, warehouses and industrial plants
 
-SYSTEM LEGATO -




 
 
home  |  email  |  call back service
- SIN-WELLSTEGTRÄGER -
 
-SYSTEM LEGATO -