Build a steel hall with PEM:
High-quality steel hall construction for industry and commerce
As a specialist for hall construction in Austria PEM relies on steel – the particularly flexible, durable, and sustainable building material of modern industrial architecture. With over 45 years of experience in commercial and industrial construction, we offer you customized steel halls, which meet the highest quality standards and are also economically convincing.
Steel – the ideal building material for modern hall constructions
steel offers you as a builder numerous advantages: a high cost-effectiveness due to the exceptional service life as well as easy assembly, trouble-free disassembly, and flexible expansion options. These features make steel halls the first choice for future-oriented companies.
Highest quality standards in PEM steel hall construction
For professional steel hall construction, PEM uses exclusively the highest quality materials according to current European standards. Especially the complete hot-dip galvanization of all steel hall constructions effectively prevents corrosion damage and guarantees maximum service life with minimal maintenance costs.
PEM steel halls impress with an exceptionally long service life and thus offer you a sustainable investment in the future of your company.

Optimal production capacities in Europe
As part of the successful Zeman Group, PEM has three state-of-the-art production plants in strategically located countries: Austria, Poland and Turkey.
This European production structure enables short delivery routes and flexible project execution with a Total production capacity of 35,000 tons per year.
The convincing advantages of
PEM steel hall constructions
The use of steel in modern hall construction has been a continuous success story. This is based on measurable advantages, which are particularly crucial in today's times of economic challenges.
Economic advantages
30% cheaper to purchase
with equal or longer lifespan compared to other building materials
Exceptionally low maintenance effort
over the entire service life
High value stability
and recyclability at the end of the service life
Construction time and assembly
Minimal production time
due to high prefabrication in our production facilities
Fast, weather-independent assembly
on site by experienced assembly teams
Precise components
enable on-schedule project realization
Design and functionality
Slim, modern design
with large spans without supports
Flexible floor plan design
for optimized operational processes
Effortless expandability
for growing requirements
Our comprehensive services for your steel hall
Individual planning and structural calculation
Based on your individual usage requirements and required size dimension our experienced PEM experts precisely plan your steel hall and carry out a detailed structural calculation according to the specific requirements of your building site.
In order to save heating costs in the long term and maximum energy efficiency to ensure, PEM also offers high-quality insulated steel halls with modern insulation systems.
Insulated steel halls from PEM offer excellent energy efficiency and optimal room comfort. Through modern insulation systems in the roof and walls, heat loss is reduced and stable indoor climate conditions are ensured.
Our individually adaptable insulation concepts meet the highest requirements for thermal insulation, sound insulation, and fire protection. With tailor-made solutions for insulated steel halls, we ensure the optimal implementation of your construction project.
Professional manufacturing and on-time assembly
After careful planning of the roof and wall systems we create precise steel construction drawings and hand them over to our state-of-the-art production plants. Directly from production, the individual steel components are delivered „just in time“ to the construction site – for minimal storage costs and optimized construction processes.
The professional hall assembly carried out exclusively by experienced PEM–staff on site. As absolute experts in their field, they ensure the highest quality standards and an on-schedule completion.

Steel hall construction: Maximum functionality and cost-effectiveness
The optimal structural system for your requirements
The choice of the optimal structural system is crucial and ensures, in addition to maximum functionality also the most economical solution for your project. The high-quality structure – whether welded plate girders with variable cross-sections, stable trusses, innovative SIN corrugated web beams, proven profile steel or reinforced concrete columns with glued laminated timber beams – significantly influences the appearance and functionality of the hall.
factors for the optimal choice of structural system
Which structural system is most suitable for your steel hall is determined by our engineers based on a variety of technical factors:
Required span
for optimal space utilization
building height
according to your operational requirements
Specific soil conditions
of the building site
Professional foundation
according to current standards
Regional snow loads
and wind loads
Optimal distances
the construction framework
Special installations
such as crane runways, walkways or production facilities
Functional steel construction for individual usage concepts
With customized steel platforms, stable machine substructures, professional mast systems and well-designed pipe bridges we equip your new hall construction according to the individual usage requirements of your company optimally designed.
These functional steel construction elements are already taken into account in the planning phase and seamlessly integrated into the overall construction, in order to maximize operational efficiency and optimize workflows to ensure.

Your steel hall – custom-made by PEM
As experienced general contractor for hall construction we take over the complete project management from the initial consultation to turnkey handover. Our qualified planners and project managers develop together with you the optimal, economical solution for your specific requirements.
Benefit from more than 50 years of experience in steel hall construction and let yourself be convinced by our successful reference projects convince. PEM – your reliable partner for high-quality steel constructions in Austria and all of Europe.
Are you planning a new steel hall or the renovation of an existing structure?
Contact us for individual advice and a tailor-made offer.
Frequently asked questions about steel halls
Where can I view a PEM steel hall?
Over the course of 50 years, PEM has built more than 3,000 industrial and commercial halls With certainty, there is also a suitable PEM steel hall near you.
If you are interested, we will be happy to inform you about a reference near you and also accompany you to the site.
What does a standard steel hall cost per m²?
This depends on several parameters including:
- Location of the building (snow load)
- Additional loads (PV system, hall crane),
- Span widths of the frames (hall width)
- Type of roof and wall cladding (insulated/uninsulated)
- Installations (doors, gates, roof skylights, hall crane, etc.)
Depending on the configuration of the steel hall, the investment costs/m² from the top edge of the foundations range from 160.00 to 450.00 EUR/m².
From what square meter size does PEM accept orders for steel hall construction?
We see ourselves as Steel hall specialist and quality partner for steel and system halls from a floor area of approx. 750 m².
Can you guarantee me a fixed price for my steel hall?
Yes, as your reliable construction partner it is important to us that you can rely on the agreed construction budget. Even in the offer, we take into account, in addition to the hall construction components, all cost-relevant items (lifting equipment, safety devices, waste disposal, etc.) that are required for the quality- and standard-compliant planning, production, and assembly of your steel hall. Once all details regarding the execution and scope of the new hall construction are clarified, we guarantee a fixed lump-sum price, that there will be no unexpected additional costs for the customer.
