- Hall construction
In Bruck an der Leitha, Bauder Ges.m.b.H, a renowned roofing specialist, expanded its plant to eleven hectares – almost doubling the previous area. On behalf of Zeman & Co GmbH, PEM took over the steel construction work for the warehouse with stair tower, the forklift building, and the roofing for the waste container. Trusses on concrete columns including exterior walls in profile steel construction were used. Various sheet metal works such as the installation of the supporting shell on the roof and the assembly of the wall trapezoidal sheet were also within PEM's area of responsibility. In total, around 680 tons of steel were used on over 17,000 m².
Project number: 2715
Project name: Bauder, Bruck an d. Leitha
Country: Austria
Postal code: 2462
City: Wilfleinsdorf
Area: 17,050 m²
Product: Production facility
Type of use: Warehouse, production